Projects

Chemical Cleaning of Desalination Plant Evaporators and Steam Transformers (Sharjah Electricity and Water Authority)

Before Pic 1

Before

After Pic 1

After

Before Pic 3

Before

After Pic 2

After

  Chemical Cleaning of Condensers at Power Plant, Sharjah Electricity and Water Authority

Clogged Condenser Tube Before Cleaning 1

Before

Condenser Tube Bottom Side After Cleaning

After

Clogged Condenser Tube Before Cleaning

Before

After Cleaning Close Up

After

Cleaning of Heat Exchanger Plates and Re-Fit of Gaskets for Senoko Power

JetWash-BeforeSoaking

Before

Re-Gasketing

After

Evaporator Cleaning for Sharjah Desalination Plant

 

Scope in Brief

Engineering design / fabrication of customised equipment (flanges, nozzles, connectors, skids and pumps) and supply of organic acids and cleaning service for the Sharjah Electricity and Water Authority to clean:

  • Two (2) units of evaporators and
  • One (1) unit steam transformer
Evaporator-2

Operations

Evaporator-3

Operations

Evaporator-4

Before

Evaporator-5

After

Chemical Cleaning of Cooling Tower (CT) Infills for Singapore District Cooling Plant 1, SP Group


Work Scope

Chemical cleaning of Infills, fan housing and blades and basins; and installation of holding SS frames and silencer beds for CT basins and anti algae paint of FRP façade

CT_before

Before Cleaning of Fan Deck
and Blades

CT-after-2

After Cleaning of Fan Deck
and Blades

chemical-before

 Borescope of Cleaned Infills and Drift Eliminators (Before)

chemical-after

 Borescope of Cleaned Infills and Drift Eliminators (After)

Design, Supply, Install and Commission High Mast Lighting Structures for Sports Field for Singapore Cricket Association; and design and construct practice cricket pitch and standalone Gymnasium

 

Work Scope

Design, install and commission field lighting system, construction of cricket practice pitch and stand alone gymnasium.

Practice-pitch-1

Practice Pitch under Construction

Practice-pitch-2

Practice Pitch under Construction

Install high mast light -1

Installed High Mast Lights

Install high mast light -2

Installed High Mast Lights

Supply of cleaning chemicals and manpower expertise for Ca Mau Power Plant, Vietnam

electricty gererating power plant
View of power plant in production at sunset
** Note: Slight graininess, best at smaller sizes

Rolling List Of Past Projects

Cleaning of Cooling Towers (10 units) at Biopolis, for Keppel DHCS

Biopolis- Prewash

Prewash

Biopolis- afterwash

Post Wash

High Mast lighting installations at Singapore Cable Ski Park and at Yorker Sports Club

Ski Park Pics

Singapore Cable Ski Park

Yorker Sports Club

Yorker Sports Club

Chemical cleaning of ACC tube bundle for Keppel Seghers

acc tube -prechemical

Pre-Chemical Wash

acc tube -postchemical

Post-Chemical Wash

Replacement of Infills and supply of nozzle spray heads for
Glaxo Smit Kline

cross fluted fill

Infill blocks

Replacement of Infills to cooling towers at
Robertson Walk

robinson

Shinwa Infills

 Air Fin Cooler Cleaning for Exxon Mobil, Singapore

airfin-before

Before

airfin-after

After

Plate Heat Exchanger Cleaning at Senoko Energy and for Linde Gas

Plate-heat-before

Before

Plate-heat-after

After

Clearing of Pipeline Choke at Tuas South Incineration Plant

Pipeline -before 1

Before

Pipeline -aft 1

After

Pipeline -before 2

Before

Pipeline -aft 2

After

Air Cooled Condenser cleaning at Senoko Incineration for Keppel Seghers

Cooled condenser -before

Before

borescope-before

Borescope view-Before

Cooled condenser -after

After

borescope-after

Borescope view-After